[Home ]    
Journal of Islamic Dental Association of Iran awt-yekta مجله دندانپزشكي جامعه اسلامي دندانپزشكان
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
:: Volume 17, Number 3 (6-2005) ::
Back to browse issues page 2005, 17(3): 49-54
XML Effects of core preparation time on the retention of cemented cast post Print

Persian Abstract
Author(s): Omid Savabi Isfahani *, Kazem Khosravi, Maziyar Ebrahimi, Peymaneh Hosseini and Mohammad reza Malekipoor
savabi@Hotmail.com
Study Type: Research | Subject: General
Article abstract:

Effects of core preparation time on the retention of cemented cast post

Dr. O. Savabi Isfahani*-Dr. K. Khosravi**- Dr. M. Ebrahimi***- Dr. P. Hosseini***- Dr.MR. Malekipoor****

 *- Associate Professor of Prosthodontics Dept.-Faculty of Dentistry – Isfahan University of Medical Sciences.

**- Associate Professor of Operative Dentistry Dept.-Faculty of Dentistry – Isfahan University of Medical Sciences.

***- Dentist, Graduated in Faculty of Dentistry - Tehran Islamic Azad University.

****- Assistant Professor of Operative Dentistry Dept.-Faculty of Dentistry – Khorasgan Islamic Azad University.

Background and Aim: Core preparation following cast post cementation is necessary. It seems that bur vibration may result in cracks and interfere with cement setting procedure. The aim of this study was to investigate the effects of different core preparation times on the retention of cemented cast post.

Materials and Methods: Forty – eight intact canines were selected. After root canal theory posts and cores were fabricated for all samples. The specimens were randomly divided into four groups of twelve teeth. All posts and cores were cemented with zinc phosphate cement according to the manufacturer's instructions. In the first group (control) no preparation was made after cementation but cores of three other groups were prepared at different intervals (15 minutes, 30 minutes and 24 hours) after cementation. The preparations were made for 30 seconds incisally, 60 seconds palatally and 120 seconds axially. Then all specimens were stored in an incubatore for one week. An instron machine was used to determine the tensile force required for each post dislodgement. Data were subjected to one – way ANOVA at 0.05 level of significance.

Results: The mean tensile forces for groups 1 to 4 were 650.58, 641.58, 616.45 and 549.87 Newton, respectively. The differences were not statistically significant.

Conclusion: Considering the limitations of the present study, it can be concluded that with respect to the applied cement, different intervals of high – speed preparation have no significant negative effects on cast posts retention.

Key words: Cast post and core – Retention – Zinc phosphate cement - Preparation

KeywordsCast post and core, Retention, Zinc phosphate cement, Preparation,
Full text [PDF 226 kb]
How to cite this article
Download citation data for: BibTeX | EndNote | Medlars | ProCite | Reference Manager | RefWorks |  
Send citation data to: CiteULike | RefWorks |
Savabi Isfahani Omid, Khosravi Kazem, Ebrahimi Maziyar, Hosseini Peymaneh, Malekipoor Mohammad reza, Effects of core preparation time on the retention of cemented cast post Journal of Islamic Dental Association of Iran, 2005; 17 (3) :49-54
URL http://www.jida.ir/browse.php?a_code=A-10-66-1&slc_lang=en&sid=1
Send email to the article author

Add your comments about this article
Your username or email:

Write the security code in the box >
 
Back to browse issues page Volume 17, Number 3 ( 6-2005)
مجله دندانپزشكي جامعه اسلامي دندانپزشكان Journal of Islamic Dental Association of Iran
Static site map - Persian site map - English site map - Created in 0.083 seconds with 597 queries by AWT YEKTAWEB 2.0.6.5